HOW TO SETUP LINE TARGET AND OPARETION TARGET !!!!!!

You are wellcome to apparelspoint.The topic I will discuss in front of you today is how to setup garments line target and oparetion target.

Let's go to the main discussion instead of increasing the talk.

First about the line target :

The things that must be known to set up the line target are as follows :

                                                                      1. efficiency.

                                                                      2. total worker.

                                                                      3. total output.

                                                                      4. SMV.

Suppose you earn 80% of work on efficiency, Your garments SMV is 10 minute, total worker 35 parson  and working time is 10 hours.

Then the line target will stand :

           we know ,

                                       total manpower  x total working time in minut

  line target =........................................................................................................  x efficiency

                                                          SMV

                                                             35 x 10 x60

                                         =.............................................. x 80%             [ 1 hour = 60 minute ]

                                                                    10 

                                       = 1680 pcs

so line target = 1680 pcs.

secound about the OPARETION TARGET:

To setup oparetion target, you need to know about SAM .

The full meanings of SAM = STANDARD ALLOWCATED MINUTE.

Suppose you gave an operator a back pocket joint.It took 30 seconds to pair the pocket, then how much would his SAM be?

    WE KNOW ,

                                       OPARETION TIME

                 SAM =.....................................................

                                                      60 

                                                     30

                          =.........................................................

                                                    60

                        =     .5 Minute.

Now let's know how much its target will be .

                   we know ,

                                                                                    60

                                   oparation target = ...........................

                                                                    SAM

                                                                            60

                                                                 =......................

                                                                           .5

                                                                 =  120 PCS

A man can never work with 100%.Therefore, 

if the relaxation allowance of 20% is dropped, then its target stands,

                                                                                                                         80

                                                                                                      =  120 x ..................

                                                                                                                         100

                                                                                                      = 96 pcs    [  solved ]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ie-&-planing - আরোও পড়ুন

HOW TO CALCULATE PRODUCTION EFFICIENCY !

important formula for IE(industrial enginearing) proffetional and student

HOW TO SETUP LINE TARGET AND OPARETION TARGET !!!!!!

apparels, fashion or textile industry sourcing procces system!!!!!!

ফ্রেশার জবের গল্প প্রথম অংশ!!!!!!!

Apparels point facebook page

Ie & Planing

HOW TO CALCULATE PRODUCTION EFFICIENCY !

important formula for IE(industrial enginearing) proffetional and student

HOW TO SETUP LINE TARGET AND OPARETION TARGET !!!!!!
apparels, fashion or textile industry sourcing procces system!!!!!!
ফ্রেশার জবের গল্প প্রথম অংশ!!!!!!!

Marchandising

HOW TO CALCULATE GARMENTS CM

how to calculate sweing threed consumption about garments industry

Yearn numbering system (yearn count)
Length calculation of a cone of sewing thread
LC কি । কিভাবে L/C খুলতে হয়। opening method of a L/C account !!!!!!!
মার্চেন্ডাইজারদের জন্য গুরুত্বপূর্ণ কিছু ক্যাল্কুলেশন!!!!

sample & cad

বেতন অনুযায়ী কার বোনাস এবং বেসিক কত ???

Quality Controlled

কোয়ালিটি ডিপার্টমেন্ট কেন আজ অবহেলিত!!!

cutting quality standard opareting system!!!কাটিং স্ট্যান্ডার্ড অপারেটিং পদ্ধতি!!

নিটিংঃ গুরুত্বপূর্ণ টার্মসমূহ এবং মেশিন পার্টস"
গার্মেন্টস এর ফেব্রিক এর কিছু টেস্টিং এর নিয়ম এবং প্রসিডিউর

Cutting

HOW TO MAKE FABRIC CONSUMPTION !!! (T-SHIRT)

গার্মেন্টস এর ফেব্রিক এর কিছু টেস্টিং এর নিয়ম এবং প্রসিডিউর

Finishing

HOW TO CALCULATE CARTON MESURMENT EASILY!!!!!!!

washing

Recipe of Garments wash

Recipe of Rinse wash

What is washing???????
how to enzyme washing procces about danim pant